VIEW FULL VERSION: Link
Subject: The installation requirement of construction waste
Content: The installation of construction waste crusher should be strictly in accordance with the requirements of assembly drawing and foundation drawing construction standards; before installing the dryer, check inventory and all assistant pieces. Since the dryer is large long body, so it should be installed according to the following methods: (A) Scratch baseline: make right crosshairs and elevation line on the basis of standard board; center standard plate should be easy-to-use and accurate as well as the installed base could not be covered. (B) Install base and tugboat Level pad iron location, draw the center line of base and tugboat; identify the installation location of base and tugboat in accordance with the requirements of the drawings; then grouting foundation hole and tighten the anchor bolts when concrete reaches a certain intensity; after re-inspection, install the cylinder. (C) Install cylinder and rolling ring First mount rolling ring on the barrel construction waste crusher , the fixed concave joint should be with staggered configuration; and then adjust the thickness of pad iron so that the contact between roller and the concave connector maintains an appropriate gap; and finally spot-welded the concave joint bolt head and cylinder body. (D) Install the large gear Keep docking surface interface without collision traces before installation, clean the contact surface of large gear and cylinder, carefully fold the two halves gear and tighten the connector bolts, then mount large gear on the cylinder. Rotating cylinder, check the gear run out and lateral swing until transfer qualified. (E) Install small gear, reducer and motor According to the packed large gear to adjust meshing parameters of large and small gears to reach the equipment requirements, then fix the position of pinion, reducer and motor. (F) Install gear cover and keep the distance from the edge of the gear symmetrical.